Our system can feedback to the PLC or our Software when a maintenance warning or error has passed. Greasing is required every 200,000 to 500,000 cycles depending on usage. We will calculate your requirement based on your duty cycle.
FAQs about the TOX® ElectricDrive
Frequently asked questions
General
How do I know when to perform maintenance on the press?
Where can you store all curve data points?
Is processing of all process data in real time possible?
What maintenance is required?
Which ingress protection class does the press system or the connectors meet?
Can these be used in a clean room?
Is there user administration available in the Software?
In what temperature range can these units operate?
Do I need a dedicated PC to run this press?
Where is the 0 position of the ElectricPowerDrive and what do I need to pay attention to as a designer?